The body is starting to take shape. One picture with footboards, one without, and a detail showing the cutaway where the base of the gear lever will be. Crosshead screws are only being used where they won't show. The "pile" of parts is for the second body that is being built at the same time.
My restoration. I'm called Lofty because I spent so much time in the loft. Some of me is still there!
Saturday, 11 February 2017
Thursday, 5 January 2017
Thursday, 22 December 2016
Saturday, 10 December 2016
Timing Gear
These are newly cast and machined timing gears, this particular gear goes on the crank. That's it, everything needed for balancing is ready bar a couple of studs. Full dry assembly next, then white-metalling and balancing.
Sunday, 4 December 2016
Dynamo sleeve
The dynamo was in a post a few weeks ago, it's too small so a hollow cylinder has been cast which will be machined down to make a sleeve to hold the dynamo in place. It's out of sight thankfully!
Crank handle cone casting
There are three sizes of starter handle cone. I have two starter handles, but sod's law intervened so this is a new cone casting ready for machining. just behind it is a new radiator trunnion casting with the second one on the other side of the cross-shaft. Apologies for the blurry photo!
Subscribe to:
Posts (Atom)






